Services are going in at our next project site!
Services are in & site prep has begun
Underground plumbing is all in at Project Q! && all the markers have been laid out for the helical pile foundation to be installed!
ADU foundation going in at Project Q!
ADU Progress at Project Q: Foundation complete – Floor and roof have been built! Getting ready for the house halves to be craned into place!!
Foundation for the primary house is in at Project Q! && the roof for the ADU is shingled and ready for the halves to be delivered to the site!
Before –> During –> After! Pictures of the ADU for Project Q get craned into place today!
Project Q House A crane in day recap! House A is our two storey model composed of two 1- bedroom units stacked on top of one another!
Project Q from above! Two 1- bedroom units stacked as the primary house with a single 1- bedroom unit in behind as the ADU!
Project Q ADU! Trenches are dug to run electrical to the front house and we added a front porch and railing! Next up is completing interior wiring and finishing up drywall!
Project Q Primary House! – Stairs and landings are built! We expanded both landings this build and plan on making them even bigger next time for more outdoor space! – Working on finishing up electrical and plumbing in both units
Project Q Updates: – electrical is all run to house A and trenches are filled – electrical almost complete inside both units in house A – drywall has begun in the ADU! – Stairs and railing complete on House A
Project Q’s 3 units are in various stages of completion. The ADU has the drywall up and flooring going in. && the front houses units are ready for drywall to begin!
Project Q ADU is coming together! Flooring is in and all the kitchen cabinets have been installed!
Drywall’s being hung in the front house at Project Q !
Project Q Updates: -ADU has the trim and doors going in -Upper units flooring is in and ready for the kitchen to be installed -Lower units drywall has started to be hung
Upper unit kitchen at Project Q is all in. Loving the new kitchen cabinet layout for this project!
Siding and soffits complete at Project Q! Exteriors looking good!
Project Q updates: – Countertops installed in the upper unit & ADU – Backsplash is up in the upper unit & ADU -Exterior lights installed -Drywall and first coat of mud is complete in the lower unit
Project Q coming along! Driveway and pathway prep has begun. Bathroom vanities and microwaves are in!
Home stretch at Project Q!
We were able to try out 3 different kitchen countertops at Project Q! Which one is your favourite?!
Halfway done the walkways at Project Q! Ready to finish up the driveway this week
Driveway is in and we have occupancy at Project Q!!
Project Q Final Pictures!