Sneak peak of our next project! Project U is a 6- Plex consisting of 6- two bedroom, one bathroom units. Foundation is already in and we can’t wait to see the progress!
Foundations in at Project U!
Helical piles for the two ADU’s at Project U are going in! Project U will have a fourplex in front with two detached ADU’s in the back!
Framing progress at Project U!
One of the ADU’s at Project U is all framed in and the rigid insulation is on!
Framing progress for the 4- Plex at Project U!
Going up at Project U!
Exterior progress at Project U!
Interior framing progress of the second floor at Project U!
Framing, roof and window progress at Project U of all 3 buildings!
The ADUS at Project U looking perfect!
Exterior& interior progress at the main building at Project U. This main building will be composed of 4 separate units!
Insulation going in at Project U!
Progress of the 2 ADU’s at Project U!