Clean up complete at our Downtown location! Old fences gone, trees removed and wood chips down. We are ready to begin construction!
Excavation has begun at the Downtown location!
Excavation is complete and footings are in!
Special delivery at the Downtown site today… Foundation walls will begin this week!
Foundation wall forms are up and concrete is poured!
We have foundation walls!! Next up: back fill and waterlines
Foundation is all waterproofed!
Thanks to our awesome plumbers at Platinum Plumbing Inc. sanitary is almost done!
Before and After at the Downtown location! Water and sanitary have both passed and the backfill is complete!
End of framing day 1 and we have a wall!
Day 3 of framing complete! Things are starting to come together!
Day 4 of framing and we have a roof!
Fence posts are in! We love how the black steel posts turned out! At this location, there was a previously existing home at the front of the property and the tiny house is being built at the back! By adding a fence in the middle, we will be creating a private green space for both homes!
Top soil down and all the sod is laid! One more days work and the fence will be all done too! What a difference grass can make.
And that’s a wrap on the fence! We love how it turned out! Once the two gates are installed, this yard will be fully enclosed making it perfect for the family to enjoy.
Windows and doors are in! We are SO happy with how the black windows look!
Electrical and plumbing is coming along well! A couple progress shots from today!
HVAC is in! We decided to go with a ductless mini split system.
We have shingles!
Pretty in pink! Insulation is well underway!
Insulation ✔
Driveway, grading and retaining wall prep!
& we’re officially on the grid! We got connected to city power today!
End of drywalling day 1!
End of drywalling day 2! All the drywall has been hung & the shower/ tub combo was plumbed in today!
Sittin’ pretty.
Day 1 of mudding and taping
Lots going on at the house the past couple of days! 3rd coat of mud/ tape is on and the exterior accent pieces got framed!
Flooring was delivered to the house today!
It’s been a hot minute since our last post but things are still coming along! Walls are painted, electrical is getting finished tomorrow and on the docket for next week: flooring, siding and maybe even some cabinets!
Let there be light!!
Floors are in!!
Kitchen and bathroom cabinets are in! We are so happy with how they turned out!
Day 1 of trim in the books!
The day we’ve been the most excited for has arrived! Siding has begun! Interior doors were also hung!
Another busy day at the tiny house! Inside: interior door handles and more trim was installed! Outside: siding day 2!
Day 3 of siding! They started the accent corner today!
Things are coming together! Accent corner complete, countertops are in, closet built ins installed & trim is done!
Finishes coming together! Window trim, taps in, toilet in!
Homestretch!! Plumbing is officially complete and we are 95% of the way there with electrical!
Backup baseboard heaters went in today! The only interior jobs left are backsplash and appliance install!
Deck & stairs install!
We’re so happy with how the deck turned out!
Backsplash is in!! Now for the install of the rest of the appliances!
Appliances ✓
And she’s all done! We are so happy with how everything turned out! This week we will have our final occupancy inspection and then it’s on to the next two!!
Nighttime Views ♥
Birds eye view!
We want to say a big THANK YOU to the almost 100 people who came to the open houses over the past week!! We were blown away with the amount of positive feedback and we are so happy everyone loved our tiny home as much as we do!