Site and shop visits for our next build, Project B2! For this build, we are tearing down an existing garage and replacing it with a 2 bedroom ADU!
Project B2 Updates: The existing garage has been torn down and all underground plumbing is in!
The two halves for Project B2 are all finished up in the shop! Next up: foundation install!
Foundation screw piles are in at Project B2!
Project B2 delivery day!
Project B2 all put together after delivery day!
Project B2 updates! Siding is complete -Front and back porches are built -Electrical/ plumbing completed -Insulation completed. For this build, our clients changed up the design slightly by adding a second door out the back!
Drywall is hung and the first coat of mud/ tape is on at Project B2! Next week the guys will work on getting the flooring and kitchen installed!
Flooring and cabinets are in at Project B2! We’re loving the custom cabinet colour our client chose!
Trim and door delivery day! Kitchen has toe kick and cabinet crown moulding installed, microwave is in and trim work has started in the bathroom!
Home stretch at Project B2! Fence and gates were installed this week – Eavestroughs are up – Interior doors and trim are in – All countertops are installed !
Project B2 final exterior photos! For this project, we tore down an existing garage and replaced it with a 2- bedroom, 1- bathroom 672 Sq Ft ADU!
Project B2 final interior pictures! We love the custom colour our clients chose for the cabinetry, as well as adding a second door out the back!