Tiny homes 2 and 3 are underway! We closed on the lot yesterday after severing it from a double lot. Drawings are almost complete for this project- stay tuned for the new design reveal next week!
Tiny homes 2 & 3 began today, with new water and sewer being dug! Excited to be working in the Ford City area of Windsor for these next builds!
First helical pile install today!
TGIF! We’ve officially received both permits for our hickory project! Breaking ground this weekend!
Site clearing and Prepping underway!
Waterlines are in!
Sanitary and storm trenches all dug
Sanitary and storm are in!
Sewer and storm passed inspection & backfill has begun!
Helical piles install day 1 in the books!
ADU helical piles complete!
That grading though! Prepping the site for a special delivery!!
Interior / exterior finishes selection day !! With a smaller space, we chose to keep everything light and bright! Can’t wait to see it all put together!
We have been quiet on social media, but we have been busy behind the scenes! Floor and roof are framed!! We are getting the site all prepped for a special delivery next week!
Roof is coming together!!
We’ve been keeping busy behind the scenes… but on site the shingles have been completed!
Exciting things happening this week!! our hickory location is getting a very special delivery!
What a day! The team was able to assemble our tiny home in the span of 3 hours!! We’re looking forward to perfecting this process as we move ahead to the next builds!
Project H looking pretty! Interior is now freshly painted and awaiting the finishing touches!
We installed the helical pile foundation for the primary house at Project H today! We can’t wait for our 2 bedroom model to be set into place!
We began the floor for the primary house at Project H this week! We can’t wait to get this tiny house craned into place!
Project H Update: The in floor plumbing has been completed in the primary house & the HVAC has been installed in the ADU!
The primary house roof is all done at Project H! The site is now all prepped and ready for the house to be delivered!
Project H flooring is in and cabinets have started to be installed! Who else thinks it looks hilarious with just a roof sitting there?!
Project H kitchen is almost fully installed!
Cabinets and countertops are in at project H! House B is in the home stretch. And just in time, as house A is ready to be delivered! Stay tuned!
Project H House A got craned into place today!! House A is our 2 bedroom model and is the primary house at this location!
Siding is on! Now we are working away at the interior of house A at Project H!
Project H progress! House A: Showers in, electrical/ plumbing’s begun and the soffits are done! House B: backsplash is in!
Project H Updates: House A: HVAC ductwork is in! House B: Deck has been completed, tile has been grouted and taps have been installed!
House A: second coat of mud/ tape is complete and dry wall will be finished up this week! House B: pot lights and peninsula lights are in and trim has started to be painted!
After some much deserved time off, the guys are ready to get back at it in 2022! Floors have been installed and first coat of paint is on at Project H house A! We went with a slightly different interior design on this one, so we are really excited to see it come together!
Kitchens going in at Project H!
House A at Project H is coming together! First coat of paint is on, interior doors are in and the kitchen’s almost entirely installed.
Project H updates!
House A: the trim, bathroom vanity and countertops got installed! and the guys started on the backsplash
House B: Appliances and handles got installed! All House B needs is a good cleaning and it’s complete!
Bedroom lights and backsplash has been installed at Project H House A!
Backsplash has been grouted, kitchen handles have been installed and peninsula lights are in at Project H House A!
Project H House B is finished and ready for a good cleaning! We added crown moulding to this unit and we are so happy with how it all came together!
Project H House A is in the home stretch and will be finished up this week! Darker finishes and a new layout make this unit a little different, however it’s quickly turned out to be our favourite interior so far!
All the appliances, handle and fixtures are in at House A!
Project H House A sitting pretty underneath a blanket of snow featuring a new front porch!
Project H House B Final Pictures !! This is our 1 bedroom model sitting at 431 Sq Ft. It is situated behind the primary 2 bedroom house on this lot and would be classified as the accessory dwelling unit or ‘ADU’!
Final grading & driveway prep is underway at Project H! Taking full advantage of these warmer temperatures!
Some landscaping coming together at Project H!
House A final pictures! This beauty sits at 672 sq ft. and features 2 bedrooms, 1 bathroom, a utility room with laundry and a pantry! We changed things up a bit design wise with this house and we’re loving how it turned out!
Project H from above! Aerial view of how the two houses are situated on one lot! House A sitting up front with house B (the ADU) tucked in behind!