• Project Name: Project E
  • Location: Windsor, Ontario
  • Year Completed: Q4 2021
  • Size: 431 Sq Ft.

Accessory Dwelling Unit built above a 2 car garage

March 24th, 2021

Just received the drawings for our next project! Our client has an existing house and wanted an accessory dwelling unit built above a garage off the alley. We love the versatility that accessory dwelling units provide and can’t wait to get started on this next project!

April 23rd, 2021

While the tiny home is being built off site, we began site prep at our next garage ADU project!

  

June 10th, 2021

We are well underway at prepping the site for the foundation at project E! Project E is a unique build as we are building an ADU above a garage! We’re excited to see it all come together!

   

June16th, 2021

Underground plumbing is in!

   

June 24th, 2021

All set for the foundation to be poured!

June 28th, 2021

Foundation has been poured!

    

July 10th, 2021

Garage portion of project E is all framed!

   

   

July 13th, 2021

Second story 1 bedroom tiny home well on its way to being framed!

   

   

July 14th, 2021

& we have a roof!

   

   

July 22nd, 2021

Project E update!! Roof is on, stairs have been built and electrical/ plumbing has begun!

July 27th, 2021

Electrical and plumbing passed inspection today! Next up: finishing up the HVAC and installing the windows and siding!

 

 

August 3rd, 2021

Windows are in and we are loving the black! Now onto siding!

   

August 10th, 2021

We are loving how the siding is turning out!

   

August 13th, 2021

Finished up all the siding, soffits and fascia! Now onto the interior!

   

August 22nd, 2021

Insulation and spray foam is in at Project E!

   

   

September 7th, 2021

Drywall is up and first coat of paint is on at Project E!

  

September 13th, 2021

Driveway and walkways going in at Project E!

 

   

September 17th, 2021

Flooring is in at Project E! We are loving how this project is coming together

   

September 25th, 2021

Interior is coming together at Project E!

      

September 28th, 2021

Concrete is in!

   

October 9th, 2021

Kitchen cabinets are going in!

   

 

 October 12th, 2021

Project E updates: outside railing is going up and bathroom cabinets are in!

       

October 16th, 2021

Home stretch at Project E! Countertops, light fixtures and sinks are in and the final coat of paint has begun!

   

October 20th, 2021

Microwave and backsplash is going in!

     

October 25th, 2021

Project E ready to be cleaned and appliances to be installed!

 

October 29th, 2021

& thats a wrap on Project E!